The Chao Phraya dam release was cut from 900 to 700 cubic metres per second, and officials are pumping flood water out of low-lying fields so land can be replanted. Rain and high tides are forecast 31 Oct to 6 Nov, so expect delays in pumping and possible re-flooding. About 1.83 million rai of farmland was affected, with 431,872 rai confirmed damaged, mostly rice. Affected farmers should check their agricultural registry, file form Kor Sor 01 through the district agriculture office, and join the community verification. The survey is expected to finish by December 2026.