Rapid Media

Archive

September 26, 2026

Toyota and Lexus offer 30-50% parts and service discounts to flood-hit car owners until 31 December 2026
69 Prachachat · Sep 26, 2026
Toyota and Lexus offer 30-50% parts and service discounts to flood-hit car owners until 31 December 2026
▾ Hover for summary ▾ Tap for summary

Toyota Motor Thailand and Lexus dealers nationwide are offering flood-affected owners 30% off general repair parts and chemicals, 30% off body and paint parts (insurance-covered costs excluded), and 50% off carpet and sound-insulation parts, valid from the announcement date until 31 December 2026 at all showrooms. Auto repair shops and parts sellers in flood areas should expect competing discounts and price pressure. Owners of damaged cars can use this to cut repair costs.

Toll-free M7 and M9 motorways until 27 Sept as flood detours open up
82 Prachachat · Sep 26, 2026
Toll-free M7 and M9 motorways until 27 Sept as flood detours open up
▾ Hover for summary ▾ Tap for summary

The Department of Highways and DMT have waived motorway tolls from 14:30 on 26 Sept 2026 (M7 and M9 from 13:00) until midnight on 27 Sept, to ease flood traffic, especially on Vibhavadi Rangsit. DMT warns small cars to avoid the Chaeng Watthana (inbound), Lak Si/Lak Si exit (outbound) and Lat Phrao (outbound) toll gates because flood levels there remain high. If your deliveries or staff commute go through north Bangkok, plan routes and timing around these dates and check flood points before dispatching.

Tourism minister orders agencies to help flood-hit tourists at Suvarnabhumi
62 Prachachat · Sep 26, 2026
Tourism minister orders agencies to help flood-hit tourists at Suvarnabhumi
▾ Hover for summary ▾ Tap for summary

Heavy rain across several areas has caused flight cancellations and stranded tourists at Suvarnabhumi airport. The Tourism Ministry has set up an operations centre with the Tourist Police and TAT, and tourists can call the Tourist Police hotline 1155 or the 24-hour Tourist Assistance Center. For hotels and tour operators, expect guests who are delayed or need extra nights; TAT is coordinating with accommodation providers. The article gives no figures on how long disruption will last.

Donmuang Tollway is free to use until 27 September because of flooding on Vibhavadi Rangsit Road
76 Prachachat · Sep 26, 2026
Donmuang Tollway is free to use until 27 September because of flooding on Vibhavadi Rangsit Road
▾ Hover for summary ▾ Tap for summary

DMT, the operator of the Donmuang tollway, has waived all tolls from 14:30 on 26 September until 24:00 on 27 September 2026 because of flooding on Vibhavadi Rangsit Road. Light vehicles should avoid the Chaeng Watthana (inbound), Lak Si (outbound) and Lat Phrao (outbound) toll gates, where flooding is deep and only large vehicles can pass. If your staff or deliveries use this route, plan the trip around the flooded gates and expect the free road to be busy.

Partner Nellika Consulting Empower businesses to thrive in the digital age.
Civil service offices may let staff work from home on 28-29 September due to flooding
74 Prachachat · Sep 26, 2026
Civil service offices may let staff work from home on 28-29 September due to flooding
▾ Hover for summary ▾ Tap for summary

The Civil Service Commission (ก.พ.) asked government agencies to consider 100% work-from-home for 28-29 September 2026 because heavy rain and flooding are expected to continue into early next week. This applies to government offices, not private firms, so it is a signal rather than a rule for your business. If your customers or suppliers are government agencies, expect slower approvals and visits on those days. Check your delivery routes and staff commutes for flood risk, and plan for possible disruption.

PM returns early from UK to lead flood response, as Bangkok flooding continues
76 Prachachat · Sep 26, 2026
PM returns early from UK to lead flood response, as Bangkok flooding continues
▾ Hover for summary ▾ Tap for summary

PM Anutin is cutting short his UK trip and arriving in Thailand around 08.00 on 27 September 2569 (2026) to run the flood response. Bangkok governor leads flood management in the capital; the Disaster Prevention and Mitigation Department (ปภ.) is supplying equipment and manpower. For a small business in flood-hit areas, follow official updates via NBT 2HD, ThaiWater, and the 1784 emergency line or LINE @1784DDPM for help requests. Plan for disruption to access, stock and deliveries while water is high.

Rangsit flood pump station ramps up drainage for Pathum Thani and north Bangkok as heavy rain looms
68 Prachachat · Sep 26, 2026
Rangsit flood pump station ramps up drainage for Pathum Thani and north Bangkok as heavy rain looms
▾ Hover for summary ▾ Tap for summary

Deputy PM Yodchanan Wongsawat inspected the Pak Khlong Rangsit semi-permanent pump station and ordered faster drainage to relieve flooding in Pathum Thani (Thanyaburi, Khlong Luang, Lam Luk Ka) and northern Bangkok. The station runs 20 pumps with up to 120 cubic metres per second capacity, currently at 78 m3/s, with a planned peak of 90 m3/s. Agencies in the north were told to prepare for more rain over the next 1-2 days. For businesses in these areas: check flood-prone stock and equipment, and plan access routes, since flooding and road disruption may follow.

Ayutthaya flood alert: 5 districts declared disaster zones as the government diverts Chao Phraya water sideways
71 Prachachat · Sep 26, 2026
Ayutthaya flood alert: 5 districts declared disaster zones as the government diverts Chao Phraya water sideways
▾ Hover for summary ▾ Tap for summary

Deputy PM Ekniti ordered proactive flood management in Phra Nakhon Si Ayutthaya. The province has declared 5 districts, 64 subdistricts and 301 villages as disaster zones. Chao Phraya is discharging 1,900 cubic metres per second from the dam, and water is being diverted to both banks and into flood-retention areas. The Industry Ministry says industrial estates in the province have raised dikes and are monitoring water levels. If you run a business in Ayutthaya, the lower Chao Phraya, or along the river, check your flood barriers, pumps and evacuation plan now, and plan for possible access and staffing disruption.

Partner Linguini Your real translator for LINE and Discord.
Flood panic buying empties shelves for days; stock at stores is fine, restocking may lag
70 The Standard Wealth · Sep 26, 2026
Flood panic buying empties shelves for days; stock at stores is fine, restocking may lag
▾ Hover for summary ▾ Tap for summary

Mama's maker says flood alerts sent at about 09:00 triggered a rush to buy. Pork and fresh vegetables sold out first, and convenience stores ran out before supermarkets. Big retailers hold about 2–3 days of stock in their system, and distribution centres about 3–4 days. Delivery to stores may be slow because small delivery trucks struggle in flooded areas. The company expects the disruption to last about 2–3 days, not a long shortage. For a shop owner: keep a few days of fast-moving goods on hand, plan for slower restocking, and expect small neighbourhood stores to run out first.

Irrigation dept says Chao Phraya outflow at 1,850 cu m/s is within safe limits, flood risk at Nakhon Sawan not alarming
66 Prachachat · Sep 26, 2026
Irrigation dept says Chao Phraya outflow at 1,850 cu m/s is within safe limits, flood risk at Nakhon Sawan not alarming
▾ Hover for summary ▾ Tap for summary

The Irrigation Department raised Chao Phraya dam outflow to 1,850 cu m/s (from 1,750), still under the 2,000 cu m/s cap, and says the Nakhon Sawan station is not a concern. The watch area is Nakhon Sawan down to Chai Nat, where rain and tributary inflows are adding water, and Sa Kaeo and Prachinburi in the east face possible local overflow. If your premises, stock or transport sit along the Chao Phraya or in those eastern provinces, keep checking the Irrigation Department updates this week and stage any flood-sensitive stock or equipment.

Commerce Ministry orders provinces to watch stock and prices as heavy rain floods spread
74 The Standard Wealth · Sep 26, 2026
Commerce Ministry orders provinces to watch stock and prices as heavy rain floods spread
▾ Hover for summary ▾ Tap for summary

Heavy rain has begun flooding some areas, raising transport risk. The Commerce Ministry has told provincial commerce offices to track stock levels and prices of essential goods and report flood areas and needs. It is also working with wholesalers, retailers and local operators to restock affected areas. Expect possible delivery delays and local price pressure in flooded regions. Keep stock of essentials, check your supply routes, and show price tags clearly. Complaints about unfair prices, shortages or hoarding can go to the Department of Internal Trade hotline 1569 or your provincial commerce office.

Heavy rain of 100-150 mm a day hits Bangkok and vicinity on 26-27 September, flooding roads near canals
82 Prachachat · Sep 26, 2026
Heavy rain of 100-150 mm a day hits Bangkok and vicinity on 26-27 September, flooding roads near canals
▾ Hover for summary ▾ Tap for summary

TEAMG warns Bangkok and surrounding provinces could get 100-150 mm of rain a day on 26-27 September, well above the drainage design of about 60 mm a day. Canals such as Lat Phrao, Rangsit and Saen Saep are near or over their banks. Expect water of 10-20 cm on roads near canals and up to 50 cm in low basins, possibly lasting into Sunday 27 September. The cause is rainwater not draining, not river flooding; the Chao Phraya is at safe levels. For shops and workshops in low-lying or canal-side areas, move stock off the floor, plan for delivery and staff disruption, and keep vehicles out of flooded roads.

Partner VentureSwap Want to buy or sell a business?
The Mall opens free car parking at 5 branches for flood-hit residents on 26-27 September
65 Prachachat · Sep 26, 2026
The Mall opens free car parking at 5 branches for flood-hit residents on 26-27 September
▾ Hover for summary ▾ Tap for summary

The Mall Group is offering free car parking at all The Mall Lifestyle branches and The Mall Korat from 26-27 September 2026 for customers affected by flooding. Parking is first-come, first-served, needs registration with a copy of your ID card and vehicle registration, and is limited to specified floors. Owners in flood areas near these branches can use it to park vehicles safely; the mall is not liable for damage or theft inside cars.

Thai Thiew Thai Plus delayed to April 2027, hotels push for green-season timing
75 Prachachat · Sep 26, 2026
Thai Thiew Thai Plus delayed to April 2027, hotels push for green-season timing
▾ Hover for summary ▾ Tap for summary

The 4,000-million-baht Thai Thiew Thai Plus scheme (1 million rights) has been moved from late 2026 to April 2027 to boost low season. Northern hotel operators argue the peak Oct-Dec months are already 70-80% booked and that PM2.5 haze (Mar-May) hurts north demand. They propose running it in the June-September green season, or in Feb-Mar. Nothing is confirmed yet. Plan cash flow for late 2026 without the subsidy, and watch for final dates before pricing or promoting any scheme-linked rates.

Major banks close many Bangkok and Samut Prakan branches on 26 Sep 2026 due to flooding
88 Prachachat · Sep 26, 2026
Major banks close many Bangkok and Samut Prakan branches on 26 Sep 2026 due to flooding
▾ Hover for summary ▾ Tap for summary

Government Savings Bank, Krungthai and SCB have temporarily closed dozens of branches in Bangkok, Nonthaburi, Pathum Thani and Samut Prakan on 26 Sep 2026 because of flooding. Savings Bank says it will keep announcing more closures for other areas. If your business banks at a listed branch, plan cash deposits, cheque clearing and bill payments through another branch, app or ATM, and check each bank's branch notice before visiting. Branches in flood zones may stay closed beyond one day.

Eight Expressways Toll-Free Until Midnight 27 Sept Due to Flooding
76 Prachachat · Sep 26, 2026
Eight Expressways Toll-Free Until Midnight 27 Sept Due to Flooding
▾ Hover for summary ▾ Tap for summary

The Expressway Authority of Thailand (EXAT) has waived tolls on eight expressways from 13:00 on 26 Sept until midnight on Sunday 27 Sept 2026, due to heavy rain and flooding. Affected drivers and delivery vehicles can use these routes at no toll. EXAT and BEM will post which on/off ramps are flooded or closed, so check before dispatching. Plan delivery routes and staff commutes around closures and allow for heavy traffic.

Partner GoWeGo Together GoWeGo! Ferry tickets in Thailand.
Social Security board election may move polling units or dates in flood-hit areas
68 Prachachat · Sep 26, 2026
Social Security board election may move polling units or dates in flood-hit areas
▾ Hover for summary ▾ Tap for summary

The Labour Minister has ordered the Social Security Office and its election committee to assess flood risk before the 2026 Social Security board election. Polling units in hard-hit areas may be moved to safer sites or the vote postponed locally, and travel help is being set up. Employers with staff in flooded provinces should check whether their workers' polling station has changed. Official decisions are promised from the Social Security Office.

GSB closes dozens of Bangkok and Nonthaburi branches over heavy rain, so plan cash and transfers around it
84 Prachachat · Sep 26, 2026
GSB closes dozens of Bangkok and Nonthaburi branches over heavy rain, so plan cash and transfers around it
▾ Hover for summary ▾ Tap for summary

On 26 Sep 2026 GSB (Government Savings Bank) temporarily closed or suspended services at about 27 branches across Bangkok and Nonthaburi because of heavy rain and travel disruption, with more areas to be announced. Owners who bank at these branches, including those inside Central, Big C, The Mall and Pata outlets, should move deposits, cheque clearing and cash handling to another GSB branch, app or counter service. Check the GSB Society Facebook page for updates before sending staff to the bank.

All 50 Bangkok districts declared disaster zones as flooding spreads, so plan for closed roads and stock damage this week
90 Bangkok Post · Sep 26, 2026
All 50 Bangkok districts declared disaster zones as flooding spreads, so plan for closed roads and stock damage this week
▾ Hover for summary ▾ Tap for summary

The Bangkok Governor has declared all 50 districts disaster zones after heavy rain caused flooding and traffic problems, with eastern Bangkok hardest hit. Canal levels are critical and expected to rise, and the Chao Phraya Dam discharge is being raised to 1,950 cu m/sec. Flooding has been reported in 20 provinces, and heavy rain is forecast nationwide until Sunday. For a Bangkok shop or workshop, expect delivery delays and road closures, move stock and equipment off the floor, and check whether your staff can get to work safely.

Flooding delays mall openings in Bangkok on 26 Sep, so expect slower foot traffic
80 Prachachat · Sep 26, 2026
Flooding delays mall openings in Bangkok on 26 Sep, so expect slower foot traffic
▾ Hover for summary ▾ Tap for summary

The Mall Group has pushed opening times to 12:00 on 26 September 2026 at The Mall Ngamwongwan and The Mall Lifestore Bangkapi because of flooding. Fashion Island and The Promenade have also closed temporarily that day. If your shop sells in or near these malls, expect a slow morning, plan staff start times and stock deliveries around it, and check for further closure notices.

Partner Rapid OS — by Nellika Stop running your company on Excel.